"प्रवेशद्वार:अंतरिक्ष उड़ान/Spaceflight news/2016 archive": अवतरणों में अंतर

No edit summary
No edit summary
पंक्ति 5:
* 11 April: [[NASA]]'s ''[[Kepler (spacecraft)|Kepler]]'' space telescope stabilizes after entering emergency mode five days before.
* 11 April: The [[United Launch Alliance]] and [[Bigelow Aerospace]] announce a plan to build commercial [[space station]]s using Bigelow's [[BA 330]] inflatable space modules.
* 10 April: For the first time, both spacecraft of [[NASA]]'s [[Commercial Resupply Services]] are docked to the [[International Space Station]], with [[SpaceX CRS-8]] joining [[Cygnus CRS OA-6]].
 
* 8 April: After launching [[SpaceX CRS-8]], the first stage of a [[Falcon 9 full thrust]] rocket lands successfully on an [[autonomous spaceport drone ship]], Marmac 304 ''Of Course I Still Love You'', in the [[Atlantic Ocean]] off [[Cape Canaveral]], [[Florida]].
* 5 April: [[John M. Grunsfeld]], [[NASA]] astronaut and associate administrator of their [[Science Mission Directorate]], announces his resignation from the organization.
* 28 March: The [[Japan]]ese ''[[Hitomi (spacecraft)|Hitomi]]'' telescope has malfunctioned, and is believed to be tumbling. [[JAXA]] is attempting to recover it.
</onlyinclude><!-- Please move this line so that only the seven most recent items appear on Portal:Spaceflight at any given time -->
* 28 March: The [[Japan]]ese ''[[Hitomi (spacecraft)|Hitomi]]'' telescope has malfunctioned, and is believed to be tumbling. [[JAXA]] is attempting to recover it.
* 24 March: The [[United States Air Force]] ceases efforts to recover the failed [[Defense Meteorological Satellite Program|DMSP-19]] meteorological satellite, ending its mission prematurely after two years.
* 16 March: [[NASA]] announces Project Saffire, a plan to ignite a [[fire]] aboard [[Cygnus CRS OA-6]] after it has un-docked from the [[International Space Station]] to study the behavior of fire in [[microgravity]].